home/categories/project-management
category focus

Project Mgmt

Planning, tracking, and collaboration.

3083 skillsall categories
sorting
stars
current ordering strategy
query
all entries
refine the visible subset
project-managementmarketplace
0

ext-triage-reqs

Triage extension for requirements findings during plan-finalize phase

cuioss
cuioss
business
open
project-management
0

aico-frontend-plan

Create ATOMIC implementation plan for a single frontend task. Each step has exact code and verification command. IMPORTANT: This skill creates MICRO-LEVEL atomic steps, NOT macro architecture plans. For architecture planning or feature scoping, use EnterPlanMode instead. Use this skill when: - Running /frontend.plan command - User explicitly asks for "atomic steps", "step-by-step plan with verification" - Have a specific task from docs/reference/frontend/tasks/ and need implementation steps - Need granular steps: Setup (create files) → Implementation (write code) → Test (verify) → Commit DO NOT use for: - Architecture planning (use EnterPlanMode) - General development planning - Feature scoping or estimation Output: Present plan to user (not saved to file), each step includes Files, Action, and Verify command.

yellinzero
yellinzero
business
open
project-management
0

task-architect

PRD를 바탕으로 실행 가능한 단위의 Todo List를 생성하는 스킬

jongsujin
jongsujin
business
open
project-management
0

systematic-debugging

Use when encountering any bug, test failure, or unexpected behavior, before proposing fixes - four-phase framework (root cause investigation, pattern analysis, hypothesis testing, implementation) that ensures understanding before attempting solutions

penne-0505
penne-0505
business
open
project-management
0

beads-task-ready

List Beads tasks that are ready to start (no open blockers)

dikini
dikini
business
open
project-management
0

systematic

Use when encountering any bug, test failure, or unexpected behavior, before proposing fixes - four-phase framework (root cause investigation, pattern analysis, hypothesis testing, implementation) that ensures understanding before attempting solutions

pproenca
pproenca
business
open
project-management
0

steering

steering skill Trigger terms: steering, project memory, codebase analysis, auto-update context, generate steering, architecture patterns, tech stack analysis, project structure, analyze codebase, understand project Use when: User requests involve steering tasks.

gaebalai
gaebalai
business
open
project-management
0

jira-ticket-fetcher

This skill should be used when users need to fetch Jira ticket content using either a specific ticket ID (like RD-3891) or search for tickets by title/description. It defaults to searching within the current sprint but can extend to all tickets when needed. The skill uses the Jira CLI to retrieve ticket details, status, assignee, and descriptions.

alexismanuel
alexismanuel
business
open
project-management
0

create-plan

Creates detailed implementation plans with atomic steps, model selection per step, dependency labels, and embedded TDD specifications

agno-nymous
agno-nymous
business
open
project-management
0

industrial-engineer

Ability to analyse, design, optimise, and improve systems that integrate people, processes, technology, and resources to meet defined performance, quality, cost, and safety requirements. Includes applying engineering, statistical, and systems methods to model workflows, identify inefficiencies, evaluate trade-offs, and implement improvements across operations and supply chains. Applies across manufacturing, services, logistics, healthcare, and infrastructure contexts and is independent of specific tools or industries, with human accountability retained for decisions, outcomes, and impacts.

selfdriven-octo
selfdriven-octo
business
open
project-management
0

firewatch-triage

Triages PR activity to identify what needs attention. Use when reviewing PR status, prioritizing work, checking for stale reviews, or when the user asks about PR health, what needs review, or what's blocking progress.

outfitter-dev
outfitter-dev
business
open
project-management
0

moonshot-evaluate-complexity

Evaluates complexity (simple, medium, complex) based on estimated files/lines/time. Use after task classification.

munlucky
munlucky
business
open
project-management
0

spec-driven-development

기능 구현을 위한 테크스펙과 구현 계획 문서를 작성합니다. 스펙 주도 개발 워크플로우를 지원합니다.

MALLLAG
MALLLAG
business
open
project-management
0

comprehensive-planning-spec-assistant

Unterstützt dabei, aus vagen oder konkreten Vorhaben einen realistischen Projektplan mit Spezifikation, Task-Breakdown und passenden LLM-Prompts für Umsetzungsagenten zu entwickeln; verwenden, wenn Planung, Dokumentation und Prompt-Design für ein neues Vorhaben nötig sind.

DYAI2025
DYAI2025
business
open
project-management
0

github-expert

Expert GitHub research including repository analysis, code search, contributor patterns, and project evaluation

ljchg12-hue
ljchg12-hue
business
open
project-management
0

spec-flowspec-task

Break down a spec section or milestone into actionable, session-sized tasks. Use when a milestone is too large, when starting implementation, when the user asks to break down work, or when refining task granularity.

Someblueman
Someblueman
business
open
project-management
0

workflow-pattern

Follow the team workflow expectations while working.

mbtz
mbtz
business
open
project-management
0

memory-system

Store and retrieve long-term project context, architectural decisions, and learnings.

julwrites
julwrites
business
open
project-management
0

catdecompose-task

Split oversized task into smaller tasks with proper dependency management

cowwoc
cowwoc
business
open
project-management
0

incident-response

Incident response documentation, timeline analysis, containment procedures, and IR reporting. Support the full incident lifecycle from detection to lessons learned. Use for security incidents, breach response, and IR planning.

SherifEldeeb
SherifEldeeb
business
open
project-management
0

implement

Execute plan phases, writing code in spaces/ while tracking in ideas/. Use after creating a plan with /plan to implement work.

TaylorHuston
TaylorHuston
business
open
project-management
0

spec-flowspec-status

Analyze current spec completion status and provide detailed progress report. Use when checking progress, identifying blockers, or planning what to work on next. More detailed than the /spec-flow:status command.

Someblueman
Someblueman
business
open
Previous
Page 120 / 129
Next